IRC has opportunities for both private and public power plants. The market for private power is largely untapped as a result of the projected world demand for renewable energy by 2030 (energy increase of 206.4 Qbtu and $11.2 Trillion of new investment).

We offer complete private power plant solutions providing compelling returns for self-generation of electricity. IRC will OEM or resale micro turbines (250kw to 20MW) that produce clean reliable electricity, servicing multiple industries: commercial buildings, manufacturing facilities, universities, medical centers, oil and natural gas, data and business centers, food and beverages, hospitality, and mining. IRC has also developed the capability to participate in the implementation of traditional public power (20MW to 100MW) for clean and dependable energy for communities.

Our process is to finalize the implementation and installation plans and costs for each new power solution. We additionally select the manufacturers, evaluate bids, further optimize the energy and financial models, and choose the vendors (if any) that will be sub-contractors of IRC. Below is an IRC implementation plan for Biomass and Waste-to-Energy (10WM to 20MW) power solutions. 
PPA Project Plan for Biomass & Waste-to-Energy Renewable Solutions

1. Select Land and Fuels
  1.1 Scout land with desirable qualities
    1.1.1 Potential Fuel
    1.1.2 Proximity to grid
    1.1.3 Availability
    1.1.4 Proximity to Paved Road
    1.1.5 Owned by: State, Tribal, Private
  1.2 Fuel Types
    1.2.1 Agricultural Waste
    1.2.2 Sustainable Manageable Waste
    1.2.3 Municipal Waste
    1.2.4 Other Convertible Waste Products
  1.3 Investigate Titles
  1.4 Acquire Exclusive Access to Land
    1.4.1 Purchase, Lease, Partner
2. Court Regulatory Agencies
  2.1 Identify Agencies Involved
  2.2 Zoning
  2.3 Land Use
  2.4 Water Use
  2.5 Mineral Rights
  2.6 Establish Point of Contact
  2.7 Identify Permits Needed
  2.8 Establish Permit Timelines
3. Additional Surveys and Assessments
  3.1 Start Environment Assessment
  3.2 Literature Survey
  3.3 Airborne Survey
  3.4 Geologic Survey
  3.5 Hydrologic Survey
  3.6 Geochemical Survey
  3.7 Geophysical Survey
4. Fuel Volume Mix and Commitments
  4.1 Finalize Fuel Source Volumes
  4.2 Complete Fuel Contracts
    4.2.1 Agricultural Waste
    4.2.2 Sustainable Manageable Waste
    4.2.3 Municipal Waste
    4.2.4 Other Convertible Waste Products

4-5 Select Plant Size
5. Negotiate Power Purchase Agreement
  5.1 Definitions
  5.2 Term and Termination
  5.3 Facility Description
  5.4 Commercial Operation
    5.4.1 Construction Milestones
    5.4.2 Progress Reports
  5.5 Delivery and Metering
  5.6 Approval and Permits
    5.6.1 Board
    5.6.2 FERC
  5.7 Sale and Purchase
    5.7.1 Capacity
    5.7.2 Actual
    5.7.3 PURPA Requirements
  5.8 Billing and Payment
  5.9 Operation and Maintenance
6. Construction Preparation
  6.1 Draft Building Plans
  6.2 Identify Equipment Manufacturers
  6.3 Draft Connectivity Plans
  6.4 Get Building Permit
  6.5 Get Transmission and Connectivity         Approved
  6.6 Identify Building and Connectivity         Contractor(s)
  6.7 Identify Materials Need
  6.8 Apply for QF, IPP, or EWG Status
Contact Us
Need help funding your projects? 

We can help!

100 Smith Ranch Road
Suite 122
San Rafeal, CA  94903 Office: 866.250.6224 
Fax:    415.520.5866
Copyright © 2010 International Renewables Corporation Built on Kentico CMS for ASP.NET